• No products in the cart.

Profile Photo

  • Course No E – 1619
  • PDH Units 3.00

Course No E - 1619
PDH Units 3.00
$75.00

Profile Photo

  • Course No E – 1619
  • PDH Units 3.00

Course No E - 1619
PDH Units 3.00
$75.00

Intended Audience: civil engineers and professional land surveyors

PDH UNITS: 3

Gain a better understanding of horizontal control land survey methods and techniques. This course discusses horizontal control surveys that are performed to establish a monumented reference system for a facility mapping project. These fixed horizontal control points and vertical benchmarks are then used as starting points for supplemental topographic site plan mapping. Horizontal positions of permanent monuments around a facility or project site can be established by a number of survey techniques, including traditional traverse, triangulation, or trilateration surveys from an established geodetic network on an installation or region (e.g., NSRS). Alternatively, GPS methods can be performed to extend control from an established network to the project site. Since most modern day survey crews or firms possess both GPS and total station equipment, there would be little justification for running lengthy (and costly) traverses or triangulation/trilateration networks to bring control to a local site. Therefore, the course material will focus on current practices for performing "traditional" horizontal control surveys in which control is established using total station traverse methods. Triangulation and trilateration methods are briefly touched upon.

Course Outline

1. INTRODUCTION 2. TRADITIONAL HORIZONTAL CONTROL SURVEY TECHNIQUES 3. SECONDARY OR TEMPORARY HORIZONTAL CONTROL 4. BEARING AND AZIMUTH DETERMINATION 5. ELECTRONIC DISTANCE MEASUREMENT 6. COORDINATE COMPUTATIONS 7. TRAVERSE SURVEYS 8. TRAVERSE SURVEY GUIDELINES 9. TRAVERSE COMPUTATIONS AND ADJUSTMENTS 10. TRAVERSE ADJUSTMENT (COMPASS RULE) 11. TRIANGULATION AND TRILATERATION SURVEYS

Learning Objectives

At the successful conclusion of this course, you’ll be able to identify and discuss:
  • Horizontal control survey methods
  • Minimum instrument requirements for the establishment of primary control
  • When primary project horizontal control points not permanently monumented in accordance with appropriate criteria and guidance should meet certain minimum standards
  • When to use redundancy techniques
  • Repeating and directional theodolites
  • Importance of station calibration

Prime PDH Day is back with TWO days to save big. Prime PDH sale starts Tuesday July 16 and Ends Wednesday July 17 11:59 pm, 2024.
Buy any Online Course or Webinar NOW and save 50% - as many as you need
No Limits - No Restrictions
Discount Code: PRIME24
https://nciteengineeringhub.com/

Please Join us for our next live interactive presentation tomorrow (Wednesday, 6/5, 2pmET).
https://nciteengineeringhub.com/course/live-webinar-essentials-of-photovoltaic-system-design/

ACCEPTANCE GUARANTEE


ncees

Ncite Engineering Hub engineering courses & live webinars meet NCEES Guidelines for Professional Engineer licenses renewal in all 50 states.

Ncite Engineering Hub will refund your money if the PDH credits you earn are rejected by your state board for any reason.

top
Copyright 2019 · All Rights Reserved. Ncite Engineering Hub, LLC 513 E- Main Street # 981 Charlottesville, VA 22902 USA