Description
Any physical operating constraints should be clearly outlined to ensure that water management features are operated in a safe manner and within design limitations during all phases of project life, including the construction phase. Particular care should be exercised during initial acceptance testing of the project’s regulating features.


TP - 1122 An Introduction to Excavation for Structures for Professional Engineers 



